
Truss Type 100 Ton Beam Launcher
The red flag type bridge bridge crane and the prototype bridge crane belong to this category, and the hoisting weight is also 130 tons. The jib is composed of two left and right box beams that pass through the fuselage and extend forward and backward.
Description
Truss Type 100 Ton Beam Launcher

Product Application
260T U beam beam launcher manufacturer for LRT project is used for erecting concrete box girders for high speed (250km, 350km) passenger railway lines. This machine is suitable for equal span girders or different span girders which can be 20m, 24m and 32m, 50m. The rear part has two supports. One of the supports is "C" shape column with rotary and foldable technology. The "C" shape column technology saved the traverse space during traveling and which enables to travel through tunnels with the girder transfer vehicle.
Max Span | 50m | 40m | 35m | 30m |
| Hoist Capacity | 160t | 100t | 80t | 60t |
| Lifting Speed of Trolley | 0.8m/min | 0.8m/min | 0.8m/min | 0.8m/min |
| Moving Sspeed of Trolley | 4.5m/min | 4.5m/min | 4.5m/min | 4.5m/min |
| Moving Speed of Crane | 2.7m/min | 2.7m/min | 2.7m/min | 2.7m/min |
| Loading Capacity | 80t×2 | 50t×2 | 40t×2 | 30t×2 |
| The Speed of Heavy Load | 4-8m/min | 4-8m/min | 4-8m/min | 4-8m/min |
| The Speed of Empty Load | 18m/min | 18m/min | 18m/min | 18m/min |
| Max Angle of Inclined Bridge | 45° | 45° | 45° | 45° |

Payment Method
Here show you the approximate EXW price of our product for your preview. This price just for reference for your budget, if any interest please click "More" to see detailed price sheet.
| EXW PRICE LIST FOR YOUR REFERENCE | Detailed Quotation | |||
| Load capacity | Rope length | |||
| 40m | 50m | 55m | More>> | |
| 50t | US$136000.00 | US$148000.00 | US$168500.00 | More>> |
| 100t | US$181100.00 | US$205500.00 | US$235500.00 | |
| 160t | US$243500.00 | US$285500.00 | US$305500.00 | More>> |
| 200t | US$328500.00 | US$375500.00 | US$405500.00 | More>> |
| 250t | US$427700.00 | US$458500.00 | US$502500.00 | More>> |


1.Hoist and electric parts will be packed by plywood crate, for avoiding the demage from goods crash and impact during the delivery.
2.Girders and other main parts will be packed by plastic woven cloth, for preventing rust from soppy condition during the transportation.
3.Only the best transport solution will be taken for saving your cost uttermost on finance,security and time.

Company Strength
Henan Dowell Crane Co., Ltd is a China-leading group of crane businesses which was founded in 1955, And serving a broad range of customers all over the world to provide a complete set of advanced lifting project, including Gantry crane, Bridge crane, Jib crane, Accessory.
a). Henan Dowell Crane Co., Ltd has already obtained the CCC,CE,BV,SGS,ISO OHSAS certifications and has won over 60 honors.
b). Our company offers services for more than 5000 companies, and the products are polular in more than 100countries.






Hot Tags: Truss Type 100 Ton Beam Launcher, manufacturers, gantry launcher, suppliers, customized, quotation, bridge beam launcher, price
Send Inquiry
You Might Also Like







