Double Drum Hoist 3 Phase 20 Ton Winch
Main design parameters of hoist number ● The main parameters are: Load: 3/4 load Working cycle: 10min Steel rope tension: 20KN Lifting height: 6m Rope speed: 8 (m / min) Rope speed allowable: error 5% Drum diameter: 320 (mm) Design life: 10 years Work system: Two shifts, 8 hours per shift, 300...
Description
Products Description Double Drum Hoist 3 Phase 20 Ton Winch


Product Paramenters

Model | Rated load(KN) | Rated speed (m/min) | Rope capacity (m) | Rope diameter (mm) | Motor model | Motor model (KW) | Overall dimensions(mm) | Total weight (kg) | |
JM1 | 10 | 15 | 100 | 9.3 | Y112M-6 | 3 | 620*701*417 | 270 | |
JM2 | 20 | 16 | 150 | 13 | Y160M-6 | 7.5 | 945*996*570 | 550 | |
JM3.2 | 32 | 10 | 150 | 15.5 | YZR16M2-6 | 7.5 | 1430*1160*910 | 1100 | |
JM5 | 50 | 10 | 250 | 21.5 | YZR160L-6 | 11 | 1235*1230*805 | 1500 | |
JM8 | 80 | 8 | 250 | 26 | YZR180L-6 | 15 | 2090*1475*956 | 2600 | |
JM8B | 80 | 9.5 | 350 | 26 | YZ180L-6 | 15 | 1075*1589*985 | 2500 | |
JM10 | 100 | 8 | 170 | 30 | YZR200L-6 | 22 | 2090*1475*956 | 3000 | |
JM10B | 100 | 9.5 | 250 | 30 | YZR200L-6 | 22 | 1705*1598*985 | 3500 | |
JM12.5 | 20 | 8 | 300 | 34 | YZR225M-6 | 30 | 2880*2200*1550 | 5000 | |
JM13.5 | 32 | 5 | 290 | 28 | YZP225S-8 | 22 | 2990*2363*1650 | 6500 | |
JM16 | 32 | 10 | 500 | 37 | YZR250M2-8 | 37 | 3750*2400*1850 | 8800 | |
JM20 | 50 | 10 | 600 | 43 | 45YZR280S-8 | 55 | 3950*2560*1950 | 9900 | |
JM25 | 50 | 9 | 700 | 48 | YZR280M-8 | 55 | 4350*2800*2030 | 13500 | |
JM32 | 50 | 9 | 700 | 56 | YZR315S-8 | 75 | 4500*2850*2030 | 14800 | |
JM50 | 50 | 9 | 800 | 65 | YZR315M-8 | 90 | 4930*3050*2250 | 19500 | |
JM65 | 50 | 10.5 | 3600 | 64 | LA8315-8AB | 160 | 5900*4680*3200 | 46000 |
Safety device:
1.Double limit switch.
2. Current overload protection device
3. Buffer.
4. Weight overload protection device.
5. Emergency brake.
Details Images


Application

Our Advantages

Product packaging

1.Hoist and electric parts will be packed by plywood crate, for avoiding the demage from goods crash and impact during the delivery. 2.Girders and other main parts will be packed by plastic woven cloth, for preventing rust from soppy condition during the transportation. 3.Only the best transport solution will be taken for saving your cost uttermost on finance,security and time.
Exhibition

After-sale Service

Hot Tags: Double Drum Hoist 3 Phase 20 Ton Winch China, manufacturers, suppliers, customized, quotation, offer, price
Send Inquiry
You Might Also Like













