Double girder china gantry crane installation processing 1. Preparation and precautions before installation 1.1 be familiar with drawings and technical data before installation to eliminate errors and defects caused by transportation or incorrectness according to technical requirements. If there...

Send InquiryChat Now
Product Details

MG-3


Double girder china gantry crane installation processing

1. Preparation and precautions before installation

1.1 be familiar with drawings and technical data before installation to eliminate errors and defects caused by transportation or incorrectness according to technical requirements. If there are defects, please correct them before installation

1.2 before installation, anti-rust should be checked to eliminate rust and scale. When painting and assembly are required, make the rotation of each part flexible and check the firmness of the connecting part. Bolts and the key is to fix solid, pulley, roller, wheel and so on operation is flexible, bearing is short of oil and so on

1.3. During crane handling, it shall avoid twisting, bending and collision accidents. Do not tie up the beam when lifting it. Packaging must be supported. Do not directly drag the floor or beams.

1.4 the ground should be firm, not sinking, to avoid deformation of metal structure. When stored in the open air, it should be kept appropriate. There are anti-corrosion measures.

1.5 after the crane arrives, it shall list some parts according to the packing list and record the result in the "equipment file card" (owned by the user).

1.6. The installation measurement tool must be confirmed with the standard department in the near future, or it is prohibited to use.