30t Double Girder Overhead Bridge Crane
Lifting capacity: 5-450t
Span:10.5-31.5m
Duty: A3-A6
Customized service
Description
Double girder overhead crane introduction
30t double girder overhead bridge crane, a kind of heavy duty crane. 30 ton double girder overhead bridge crane will be a useful material handling equipment for your workshops, steel mill, garage, workstations, and warehouses, etc.
30t double girder overhead bridge crane is composed with Girder frame, Crane travel device, and the trolley with lifting and moving device. There are Pave the rail for the trolley move on the main girder.
feature
2. Suitable for any environment ( High Temperature, Explosion Proof and so on);
3. Long Life Span: 30-50years;
4. Easy for Installation and maintenance;
5. Reasonable structure and strong rigidity;
6. The speed can be frequency inverter speed control;
7. Control method is cabin control or remote control;
8. Depending on lifting cargo, crane can be equipped with hanging beam magnet or magnet chuck or Grab or C hook;
9. Crane is equipped with all moving limit switch, loading limit and other standard safety devices, to promise crane work safe.

24h
On line
5years
Warranty
30+
Export experience
100+
Countries
comparison of product parameters
| Model | QD |
| Load capacity | 5-450t |
| Span | 10.5-31.5m |
| Lifting height | 6-24m |
| Lifting speed | 2.1-11.5m/min |
| Trolley running speed | 27-40m/min |
| Crane running speed | 42-75m/min |
| Work duty |
A3-A7 |
30 ton double girder overhead crane Drawing:
We have a professional team of designers who can design the most suitable drawings and plans for you based on your needs.
Our address
No.681, Xinghai Building, Xinzhong Road, Xinxiang City, Henan Province, China.
Phone Number
+8618568525956
sales@dowellcrane.com

Double girder overhead crane main parts
product detail







1.Hoist and electric parts will be packed by plywood crate, for avoiding the demage from goods crash and impact during the delivery.
2.Girders and other main parts will be packed by plastic woven cloth, for preventing rust from soppy condition during the
transportation.
3.Only the best transport solution will be taken for saving your cost uttermost on finance,security and time.
10-15days
30-40days
30-40days
30-35days
Hot Tags: 30t double girder overhead bridge crane China, manufacturers, suppliers, customized, quotation, offer, price
Send Inquiry
You Might Also Like











